Search This Blog

Popular Posts

Friday, 10 November 2017

Fibre Friday

Hi Everyone
It’s a bit of a mixed bag this week on the fibre front. I’ve had a couple of mini disasters ! and a little success. 
My Nuuk (read back last week for a look) is almost finished, I need to bind off half of the neckband and that’s it ! I probably need about an arms length of extra yarn and 5 mins knitting. I can’t quite believe it’s so close ! and I need an extra new hank of yarn. That’s the down side.  The positive is that I can knit with the remaining part of the yarn (most of it) on another project and I’ve decided on that next knit. I did think about ripping out the bottom of the Nuuk and loosing a row of the body to complete the neck band but I’m Ok with my decision and this is my next project :

                           

The new project is to be this lovely sweater by Caitlin Hunter. I love all her designs and this has been on my radar for a while. I especially like the swingy poncho style but with arms. Wonderful. I’m hoping I can knit the whole thing in various colours of Dovestone DK. I will use the extra from the Nuuk, as previously mentioned and all the other bits of Dovestone in my stash. The Dovestone in my stash is leftovers from lots of projects and I’m hoping I can find a way to incorporate all the bits, I may need to purchase extra but my starting point will be using up what I’ve got - love this idea.

Other news, I’ve started the Garland sweater, again look back last week for more on this design. I made the basic error of twisting the stitches when ‘joining in the round’ on the bottom rib. I didn’t realise, although I had thought I’d checked several times, until 3.5cms of rib had been completed. The bottom has around 300 stitches, so quite a bit of work ! My image shows the progress before ripping out ! However, I don’t feel so bad because I think, I started knitting the wrong size. The sweater does has huge positive ease but I’ve decided to bring down the size a little. I’m back on track and loving the project so far.

                    

My other news is the mini spin. This will be yarn for adding to a cardigan, eventually. I want to knit a basic cardigan, not sure exactly which pattern to use ? I’m considering adapting a Nuuk, 3/4 sleeves and a steeked front ? - ambitious, I know ! The spin worked well and I’ve got about 10gm so far. This was a test spin so will plan my spinning in 10 gm stages. I find this a doable, session spin. I’m hoping I can prepare the yarn alongside my other projects so I need to be disciplined. The BIG sweater spin (read back over the last few weeks for more) has suffered this week, again I need to be disciplined. I’ll try harder next week !

Also, I didn’t get the Polworth socks on the needles. I’ve been talking about doing this for quite a few weeks. You can see the pattern here. I do like the socks and am simply not organised re my knitting projects. I think, I tend to knit on one chosen project for a whole week and I’d like to spread around my time on different projects so will give some thinking time to this next week. I’ve always had a pair of socks ‘on the go’ but somehow I’ve not organised my time lately.

That’s it for fibre this week. 
Thanks for calling in today. Have a great weekend.
I’ll be back on Monday.


No comments:

Post a Comment